Equipment:-
1- Frameless LED Wall 2×7 – [Samsung]. 2- Wired Touch Panel Control – [Crestron]. 3- Matrix Switch, Digital to analog Converters, Distribution Amplifiers and Cabling – [Extron].
Challenge:-
Our teams were tasked with the design and install of a video wall in Network Operations Center in Huawei headquarters.
Solutions:-
Our design, engineering and installation teams successfully integrated the control room with Samsung 2×7 video wall, equipped with the capabilities to manage and display multiple computers.